
<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/">

<channel>
	<title>Koce trajanovski Archives - Albeu.com</title>
	<atom:link href="https://albeu.com/lajme/koce-trajanovski/feed/" rel="self" type="application/rss+xml" />
	<link>https://albeu.com/lajme/koce-trajanovski/</link>
	<description>Portali Albeu.com, Lajmet e fundit, shqiperi, kosove, maqedoni</description>
	<lastBuildDate>Mon, 06 Jul 2026 10:39:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
<site xmlns="com-wordpress:feed-additions:1">200116473</site>	<item>
		<title>Construction of the Skopje–Blace highway to begin in August, project worth 198.4 million euros</title>
		<link>https://albeu.com/english/construction-of-the-skopje-blace-highway-to-begin-in-august-project-worth-198-4-million-euros/913852/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 06 Jul 2026 10:39:55 +0000</pubDate>
				<category><![CDATA[english]]></category>
		<category><![CDATA[Koce trajanovski]]></category>
		<category><![CDATA[Kosovo]]></category>
		<category><![CDATA[Macedonia]]></category>
		<category><![CDATA[North Macedonia]]></category>
		<category><![CDATA[Skopje-Blace]]></category>
		<guid isPermaLink="false">https://albeu.com/lajme/construction-of-the-skopje-blace-highway-to-begin-in-august-project-worth-198-4-million-euros/913852/</guid>

					<description><![CDATA[<p>Drejtori i Ndërmarrjes Publike për Rrugë Shtetërore Koce Trajanovski, sot njoftoi se ndërtimi i pjesë së dytë të autostradës Shkup-Bllacë do të fillojë në muajin gusht dhe do të zgjasë rreth katër vite.Ai tha se projekti financohet me grant prej 30.8 milionë euro dhe një hua prej 167.6 milionë euro. [...]</p>
<p><a class="btn btn-secondary understrap-read-more-link" href="https://albeu.com/english/construction-of-the-skopje-blace-highway-to-begin-in-august-project-worth-198-4-million-euros/913852/">Read More...</a></p>
<p>The post <a href="https://albeu.com/english/construction-of-the-skopje-blace-highway-to-begin-in-august-project-worth-198-4-million-euros/913852/">Construction of the Skopje–Blace highway to begin in August, project worth 198.4 million euros</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Koce Trajanovski, director of the Public Enterprise for State Roads, announced today that construction of the second section of the Skopje-Blace highway is expected to begin in August, while the works are set to last approximately four years.</p>
<p>According to him, the project will be financed through a grant worth 30.8 million euros and a loan of 167.6 million euros.</p>
<p>Trajanovski explained that the new highway segment will be 10.5 kilometers long, and together with the 1.5 kilometers built earlier, the total length of the highway to the border will reach 12 kilometers.</p>
<p>“The grant is 30.8 million euros, while the credit (loan) is 167.6 million euros. The length of this highway is 10.5 kilometers. Previously, 1.5 kilometers were built, so the total length from the Stenkovec interchange near Skopje to the border is 12 kilometers. These 10.5 kilometers, which are the subject of today’s loan, will have two lanes in each direction with a width of 3.5 meters and a shoulder lane of 2.5 meters. The total width of the road will be 27 meters.”</p>
<p>He stressed that the route passes through hilly and mountainous terrain, as part of the Skopje Black Mountain massif, which makes construction extremely difficult. For this reason, the project includes 5 twin-tube tunnels, with a total length of around 5 kilometers, 9 bridges with a total length of 2.5 kilometers, 11 overpasses, 4 galleries for slope stabilization each 1 kilometer long, as well as 9 retaining walls, which will also serve for slope stabilization.”</p>
<p>“We expect construction to begin in August this year. According to the contract, the construction period is approximately 4 years. The consultant has been selected, the contractor has been selected, while supervision is in the evaluation phase and we expect it to be selected soon,” said Koce Trajanovski, director of the Public Enterprise for State Roads.</p>
<p>The post <a href="https://albeu.com/english/construction-of-the-skopje-blace-highway-to-begin-in-august-project-worth-198-4-million-euros/913852/">Construction of the Skopje–Blace highway to begin in August, project worth 198.4 million euros</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">913852</post-id> <image medium="image" url="https://i0.wp.com/albeu.com/wp-content/uploads/2026/07/repost-1783334389813.jpeg?fit=300%2C200&ssl=1" width="300" height="200" />	</item>
		<item>
		<title>Ndërtimi i autostradës Shkup &#8211; Bllacë nis në gusht, vlera e projektit 198.4 milionë euro</title>
		<link>https://albeu.com/maqedoni/ndertimi-i-autostrades-shkup-bllace-nis-ne-gusht-vlera-e-projektit-198-4-milione-euro/913840/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 06 Jul 2026 10:35:20 +0000</pubDate>
				<category><![CDATA[maqedoni]]></category>
		<category><![CDATA[Koce trajanovski]]></category>
		<category><![CDATA[kosova]]></category>
		<category><![CDATA[maqedonia e veriut]]></category>
		<category><![CDATA[Shkup - bllacë]]></category>
		<guid isPermaLink="false">https://albeu.com/lajme/ndertimi-i-autostrades-shkup-bllace-nis-ne-gusht-vlera-e-projektit-198-4-milione-euro/913840/</guid>

					<description><![CDATA[<p>Drejtori i Ndërmarrjes Publike për Rrugë Shtetërore Koce Trajanovski, sot njoftoi se ndërtimi i pjesë së dytë të autostradës Shkup-Bllacë do të fillojë në muajin gusht dhe do të zgjasë rreth katër vite.Ai tha se projekti financohet me grant prej 30.8 milionë euro dhe një hua prej 167.6 milionë euro. [...]</p>
<p><a class="btn btn-secondary understrap-read-more-link" href="https://albeu.com/maqedoni/ndertimi-i-autostrades-shkup-bllace-nis-ne-gusht-vlera-e-projektit-198-4-milione-euro/913840/">Read More...</a></p>
<p>The post <a href="https://albeu.com/maqedoni/ndertimi-i-autostrades-shkup-bllace-nis-ne-gusht-vlera-e-projektit-198-4-milione-euro/913840/">Ndërtimi i autostradës Shkup &#8211; Bllacë nis në gusht, vlera e projektit 198.4 milionë euro</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><html><head></head><body></p>
<p>Drejtori i Ndërmarrjes Publike për Rrugë Shtetërore, Koce Trajanovski, bëri të ditur sot se në muajin gusht pritet të nisë ndërtimi i pjesës së dytë të autostradës Shkup-Bllacë, ndërsa realizimi i punimeve do të zgjasë afërsisht katër vjet.</p>
<p>Sipas tij, ky projekt do të financohet përmes një granti në vlerë prej 30.8 milionë euro dhe një huaje prej 167.6 milionë euro.</p>
<p>Trajanovski sqaroi se segmenti i ri i autostradës do të ketë gjatësi 10.5 kilometra, ndërsa bashkë me 1.5 kilometrat e ndërtuar më herët, gjatësia totale e autostradës deri në kufi do të arrijë në 12 kilometra.</p>
<p>“Granti është 30,8 milionë euro, ndërsa kredia (huaja) është 167,6 milionë euro. Gjatësia e kësaj autostrade është 10,5 kilometra. Më parë janë ndërtuar 1,5 kilometra, kështu që gjatësia totale nga nyja Stenkovec pranë Shkupit deri te kufiri është 12 kilometra. Këto 10,5 kilometra, që janë objekt i huasë së sotme, do të kenë në të dy drejtimet nga dy korsi me gjerësi 3,5 metra dhe një shirit anësor prej 2,5 metrash. Gjerësia totale e rrugës do të jetë 27 metra&#8221;.</p>
<p>Ai theksoi se traseja kalon në terren kodrinor dhe malor, si pjesë e masivit të Malit të Zi të Shkupit, çka e bën ndërtimin jashtëzakonisht të vështirë. Për këtë arsye, projekti përfshin 5 tunele me dy gypa, me gjatësi të përgjithshme prej rreth 5 kilometra, 9 ura me gjatësi totale 2,5 kilometra, 11 mbikalime, 4 galeri për stabilizimin e pjerrësisë me gjatësi nga 1 kilometër secila, si dhe 9 mure mbajtëse, të cilat po ashtu do të shërbejnë për stabilizimin e pjerrësisë&#8221;.</p>
<p>“Presim që ndërtimi të fillojë në gusht të këtij viti. Sipas kontratës, periudha e ndërtimit është afërsisht 4 vjet. Është zgjedhur konsulenti, është zgjedhur kontraktori, ndërsa mbikëqyrja është në fazën e vlerësimit dhe presim që të zgjidhet së shpejti”, tha Koce Trajanovski, drejtor i Ndërmarrjes Publike për Rrugët Shtetërore.</p>
<p></body></html></p>
<p>The post <a href="https://albeu.com/maqedoni/ndertimi-i-autostrades-shkup-bllace-nis-ne-gusht-vlera-e-projektit-198-4-milione-euro/913840/">Ndërtimi i autostradës Shkup &#8211; Bllacë nis në gusht, vlera e projektit 198.4 milionë euro</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">913840</post-id> <image medium="image" url="https://i0.wp.com/albeu.com/wp-content/uploads/2026/07/repost-1783334101387.webp?fit=300%2C200&ssl=1" width="300" height="200" />	</item>
	</channel>
</rss>
