
<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/">

<channel>
	<title>000 Archives - Albeu.com</title>
	<atom:link href="https://albeu.com/lajme/000/feed/" rel="self" type="application/rss+xml" />
	<link>https://albeu.com/lajme/000/</link>
	<description>Portali Albeu.com, Lajmet e fundit, shqiperi, kosove, maqedoni</description>
	<lastBuildDate>Wed, 12 Aug 2026 09:02:25 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.6</generator>
<site xmlns="com-wordpress:feed-additions:1">200116473</site>	<item>
		<title>Burrel Ring Road back out to tender / Another €930,000 for a road that collapsed and never functioned for a single day</title>
		<link>https://albeu.com/english/burrel-ring-road-back-out-to-tender-another-e930000-for-a-road-that-collapsed-and-never-functioned-for-a-single-day/968272/</link>
		
		<dc:creator><![CDATA[albeu.com]]></dc:creator>
		<pubDate>Wed, 12 Aug 2026 09:02:22 +0000</pubDate>
				<category><![CDATA[english]]></category>
		<category><![CDATA[€930]]></category>
		<category><![CDATA[000]]></category>
		<category><![CDATA[albania]]></category>
		<category><![CDATA[back out to tender]]></category>
		<category><![CDATA[Burrel Ring Road]]></category>
		<category><![CDATA[Main]]></category>
		<category><![CDATA[never functioned for a single day]]></category>
		<category><![CDATA[news]]></category>
		<category><![CDATA[road that collapsed]]></category>
		<guid isPermaLink="false">https://albeu.com/lajme/burrel-ring-road-back-out-to-tender-another-e930000-for-a-road-that-collapsed-and-never-functioned-for-a-single-day/968272/</guid>

					<description><![CDATA[<p>Shpërdorimi i parave publike dhe mungesa e kontrollit mbi cilësinë e punimeve do t’u kushtojnë qytetarëve shqiptarë edhe 930 mijë euro të tjera. Ndërtimi i Unazës së Poshtme të Burrelit, një segment prej vetëm 960 metrash, kushtoi rreth 1.3 milionë euro. Por vetëm një muaj pas përfundimit të punimev [...]</p>
<p><a class="btn btn-secondary understrap-read-more-link" href="https://albeu.com/english/burrel-ring-road-back-out-to-tender-another-e930000-for-a-road-that-collapsed-and-never-functioned-for-a-single-day/968272/">Read More...</a></p>
<p>The post <a href="https://albeu.com/english/burrel-ring-road-back-out-to-tender-another-e930000-for-a-road-that-collapsed-and-never-functioned-for-a-single-day/968272/">Burrel Ring Road back out to tender / Another €930,000 for a road that collapsed and never functioned for a single day</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><html><head></head><body></p>
<p>Albanian taxpayers will have to bear an additional cost of €930,000 as a result of the mismanagement of public funds and the lack of proper oversight during the construction work.</p>
<p>The section known as Burrel’s Lower Ring Road, measuring just 960 meters in length, was initially built with an investment of around €1.3 million.</p>
<p>However, less than a month after the paving was completed, the artery suffered four major collapses, rendering it completely impassable.</p>
<p>Immediately after the damage occurred, the Albanian Road Authority promised an in-depth technical analysis to determine the causes and find the optimal solution. But while responsibility for the initial project remains unclear, the bill to be paid by the state continues to grow.</p>
<p>The repair of the structure has now entered the tendering phase, with a ceiling fund of 90.3 million lek, approximately €930,000. The winning company has been announced as “2N” sh.p.k., managed by Ndriçim Stojku, which submitted a bid of 87 million lek.</p>
<p>Expert assessments envisage that the intervention will involve the construction of piles along approximately 300 meters to stabilize the road alignment, which has been severely damaged by landslides. As a result, the total bill for a road stretching less than one kilometer will exceed €2.2 million.</p>
<p>The entire situation carries a bitter irony: Burrel’s Lower Ring Road was designed precisely to divert heavy-goods traffic away from the city center. Yet this road, which consumed several million euros from the budget, failed to fulfill its purpose from the very first day.</p>
<p>As citizens are once again forced to pay an additional €930,000, the fundamental question arises: Who will be held responsible for the failure of a €1.3 million investment that became unusable within weeks of its inauguration?</p>
<p></body></html></p>
<p>The post <a href="https://albeu.com/english/burrel-ring-road-back-out-to-tender-another-e930000-for-a-road-that-collapsed-and-never-functioned-for-a-single-day/968272/">Burrel Ring Road back out to tender / Another €930,000 for a road that collapsed and never functioned for a single day</a> appeared first on <a href="https://albeu.com">Albeu.com</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">968272</post-id> <image medium="image" url="https://i0.wp.com/albeu.com/wp-content/uploads/2026/08/unaza-burrelit.jpg?fit=300%2C189&ssl=1" width="300" height="189" />	</item>
	</channel>
</rss>
